Changes between Version 2 and Version 3 of ReviewProcessRevisions


Ignore:
Timestamp:
May 25, 2014, 4:49:51 PM (8 years ago)
Author:
Gordon Woodhull
Comment:

minor formatting

Legend:

Unmodified
Added
Removed
Modified
  • ReviewProcessRevisions

    v2 v3  
    203203(Still current.)
    204204
    205 = Fast Track Reviews
     205== Fast Track Reviews
    206206> To qualify for fast track review:
    207207>       * The component must be small.
     
    210210>       * The Review Wizard determines that the proposal qualifies for fast track review.
    211211> Procedure:
    212 
    213212>       * The Boost Review Wizard posts a review announcement to the main Boost developer's list. The review period will normally last for 5 days. No two fast track reviews will run in parallel. Fast track reviews may run during full reviews, though generally this is to be avoided.
    214213>       * After the review period ends, the submitter will post a review summary containing proposed changes to the reviewed implementation.
     
    217216
    218217
    219 == Mini-Reviews ==
     218== Mini-Reviews
    220219(add section)
    221220
    222221If a review results in conditions on acceptance, the review manager may request a Mini-Review to determine if the conditions have been met.  The Mini-Review is usually conducted by the same review manager.
    223222
    224 == Orphaned Reviews ==
     223== Orphaned Reviews
    225224(add section)
    226225